Use of large bottle water linear filling machine

<

With the continuous improvement of living standards, people's demand for beverages and daily chemical products continues to increase, the continuous development of enterprises, the use of beverage filling machines, brush bottle washer machine and more and more, linear filling large bottles of water The problems that should be paid attention to during the installation are becoming more and more acute. Therefore, for the better production of the enterprise, it is still necessary for its maintenance work.
The large bottle water linear filling machine plays an important role in the current processing industry. It is one of the necessary equipment for the production and processing of many food, beverage, medicine and daily chemical enterprises, and plays an increasingly important role in our life. For the enterprise, the use of the filling machine is not a problem, but in its maintenance and maintenance, few people know. Here, Zhangjiagang City Xin Weida machinery related technical personnel based on past experience, as follows.
First, before using the filling machine, brushing machine and bottle washer,
1. Install and then debug. Read the instructions carefully before commissioning and prepare the tools to be used.
2. After the installation, brushing machine and rinsing machine are installed, the filling track and the bottle receiving tray are leveled, the liquid storage tank is filled with materials, and all the electrical switches are in the closed position.
3. The container filled with the large bottle of water linear filling machine is inserted into the tool box, and the external power supply is connected. The power socket must be a three-pin socket and have a reliable grounding wire to prevent the machine from leaking electricity. When it is ON, the power indicator lights up.
4. The mounting support plate holds the filling frame and points to the positioning sleeve on the top filling head. The positioning sleeve should be able to move up and down flexibly, and the filling needle is exposed or retracted without hindrance.
5. The switch under the liquid storage tank is turned to the open position, so that the material can flow into the total metering pump. According to the total filling amount of each container, adjust the screw on the crank and rotate the knob of the filling speed control board to 20 degrees. Left and right, then turn the switch on the filling speed control board to the open position.
6. When the filling head is out of the liquid for the set amount, screw the liquid amount fine-tuning nut, cover the filling head casing, and loosen the filling bracket support plate.
Pay attention to the maintenance of the large-cap water straight-line filling machine. When removing and removing the piston during maintenance, remove the fixing screws at the same time to avoid affecting the other process requirements when disassembling. Before cleaning the large bottle of water straight line filling machine , the remaining product should be cleaned and then filled with soft cleaning liquid. The cylinder has been lubricated at the factory. Please do not open or add any lubricating oil to ensure that the surface of the filling machine is clean and hygienic. In addition, while maintaining and properly using the filling machine, it is necessary to conduct regular inspections and commissioning. Only such a filling machine can work healthily and steadily.

Fresh Cut Sliced King Oyster Mushroom

Fresh Cut Sliced King Oyster Mushroom,Sliced King Oyster Mushroom,Frozen Pleurotus Eryngii,Sliced Pleurotus Eryngii

Guangyun Agricultural Biotechnology (Jiangsu) Co., Ltd , https://www.7-mushrooms.com